CDM was introduced by the UK Health and Safety Executive (HSE) in 1994, before being updated in 1995 and 2015 with the aim of clarifying roles and responsibilities with project management, and encouraging the integration of health and safety.
CDM requires that a designated Principal Designer prepare (and, depending on the planned size / duration of the project, take responsibility for notifying the HSE) a Construction Phase Health and Safety Plan prior to implementation.
The IES team has considerable experience in construction phase planning and working under CDM. IES has acted as Principal Designer and Principal Contractor on various projects, most recently for the University of Southampton, providing a team of engineers as well as the management and supervision of the sub-contractors involved.
The project involved the delivery and move of equipment to the University’s B46 laboratory. The challenge was size. The equipment was too big to be moved down the university’s narrow corridors. Access could only be achieved through the building’s windows, access to these necessitated the building of special purpose platforms both outside and inside the windows to minimise height differentials.
The equipment was forklifted onto the external platform and then wheeled through the windows on machine stakes, an A frame being used to lift from the inner platform to the floor. These are delicate items of equipment and great care had to be taken to minimise stress on them during the lifting process.
Engineering Project Management from IES – benefit from an expert consultancy drawing on unmatched knowledge in several service areas.
IES offers principal designer and principal contractor services, including:
Not all customers will be immediately aware of their statutory obligations to run projects under CDM regulations. Smaller companies may not realise that any project they sub-contract automatically requires CDM, and that the HSE are increasingly vigilant in their spot checks on projects they become aware of.
Working with IES carries with it a number of benefits:
Do you have a question about our CDM capability? Use our contact form to get in touch.